This assignment has 3 parts:
Controlling risks, also referred to as “Risk Treatment”, will assist you in determining WHAT should be done in response to the risks that have been identified, in order to improve project outcomes. Fundamentally, the concept of controlling risks emphasizes the fact that, unless action is taken, the risk identification and assessment process has been wasted. Risk treatment converts the earlier analysis into substantive actions to reduce the levels of those risks with negative consequences and exploit the risks with positive consequences.
Applying your understanding of the concept of Controlling Risks, please share at least two risks that you have identified in completion of a job tasks or project (in a past or present role) and the specific actions you have taken to improve outcomes.
In your response, consider the following:
In your own words, please post a response to the Discussion Board and comment on other postings. You will be graded on the quality of your postings.
For assistance with your assignment, please use your text, Web resources, and all course materials.
Discussion Board Reminders:
Assignment CriteriaProficient DescriptorPoints
Quality of Main Post
16 Points
Total
Student’s main post meets or exceeds the following requirements:
/16 pts.
Response to Peers
16 Points
Total
Responds to a minimum of 2 peers (8 points per response)
/16 pts.
Support from Learning Resources
4 Points
Total
At least one post refers tocourse learning resources./4 pts.
Professional Writing
4 points
Response is well-organized, clear, and free of grammatical and mechanical errors.
Posts demonstrate courtesy and respect for others.
/4 pts.Total40 points possible/40 pts.